San Diego Community Power's Solar Battery Savings manual requires participating battery manufacturers to support returning a battery to its previous operating mode after a scheduled grid-services dispatch ends. For an enrolled homeowner, that makes the normal mode worth documenting during setup—not just the battery's charge percentage.
Sources were checked November 16, 2026. This article explains a manufacturer integration requirement in the linked Fall 2025 manual; it does not certify how a particular installation is operating today.
What should happen after dispatch?
Exhibit A of the SDCP program manual requires the manufacturer's integration to allow a scheduled dispatch to override the battery's default mode, such as self-consumption or time-of-use operation, and automatically restore the previous mode when the event finishes.
The same exhibit requires dispatch to stop at the customer's defined backup-reserve percentage. These are separate controls: returning to a mode does not refill energy already discharged or prove that the battery is fully charged.
Ask the installer or manufacturer how your product shows program control and the return to ordinary operation. Do not assume every app uses the same labels or displays each control transition.
Keep a simple before-and-after record
Our suggested handover checklist is:
- Record the normal operating mode and agreed backup reserve.
- Ask where program participation and dispatch status appear in the app.
- Identify the applicable dispatch schedule for your enrollment.
- Ask what indication confirms that normal operation has resumed.
- Save the installer, manufacturer and program support contacts.
For example, suppose a hypothetical household normally uses a time-of-use mode. After a confirmed program dispatch ends, the homeowner sees an unfamiliar mode label. A useful support request includes the date, Pacific time, expected mode, displayed label and any alerts. That record helps support distinguish a display question from an operating problem; the label alone is not a diagnosis.
Follow the product's instructions and seek support before repeatedly changing settings to force a result. If a problem also affects incentive performance, our SDCP underperformance follow-up guide explains the separate program process.
Confirm which program and account you have
Use the Solar Battery Savings page to confirm current participation requirements, approved equipment and contractor information. A manufacturer's similar-sounding offer is not proof of SDCP enrollment. Confirm project approval and current funding before including an incentive in a proposal; this article quotes no rebate amount or available funding balance.
Community Power provides generation service while SDG&E handles delivery and billing. SDG&E also remains responsible for utility outages. Check the bill guide for the Community Power generation section rather than assuming every San Diego County address is enrolled.
Connect everyday operation to your PPA and backup plan
A suitable solar-plus-battery PPA can help eligible homeowners access equipment without purchasing the solar system outright. The CPUC solar guide explains provider ownership and ongoing payments for generated electricity. Confirm the rate, escalator, term, battery ownership and fees, maintenance, replacement, transfer terms and remaining utility charges. A qualifying no-upfront offer is not free electricity or guaranteed savings.
Ask who handles operating-mode support under the contract and whether the proposed battery is approved for the intended program. Document that responsibility alongside the backup circuit list.
General battery guidance explains that available energy and household demand limit backup duration. Ordinary grid-tied solar alone generally cannot supply outage power; compatible backup hardware is required. Output limits, supported loads, starting charge and sunlight determine what the system can actually do.
Discuss your proposal with West Coast Alternatives. Bring your utility bill, program correspondence and equipment details. WCA is independent of SDCP and does not determine program eligibility or endorse a particular installation's operating status.