If you are reviewing a solar-plus-battery PPA for an SDG&E-served home, check which California Solar Consumer Protection Guide will accompany the interconnection paperwork. The CPUC says applications containing solar installation contracts signed December 15, 2026, or later must include Version 4.
This is a document-version requirement to plan for with your provider. It is not a reason to rush a PPA decision or assume that an equipment offer expires on that date.
Check the contract date and guide edition
The CPUC's current guide page, reviewed November 15, 2026, identifies the signed solar installation contract date as the trigger for this requirement. Its residential interconnection guidance expressly includes SDG&E's service territory.
Ask the provider to identify the applicable contract and guide edition in your package. A sales appointment date, proposed installation date or date printed on a brochure does not answer that question. If documents are revised or re-signed, ask the provider to confirm which version belongs with the resulting application.
The CPUC also requires customer initials and a signature on the guide and time to read it. Request the complete document before your signing appointment so you can prepare questions.
Keep an organized application packet
Our suggested homeowner checklist is:
- Save the guide as a separate, clearly named file showing its version.
- Keep the signed contract and its actual signature date with it.
- Ask who checks that the guide and application attachments are complete.
- Keep the final copies you reviewed, including any later revisions.
- Record the contact who will answer questions about the submitted package.
For a hypothetical example, suppose a homeowner receives a proposal in November but signs the solar installation contract on December 18, 2026. Under the CPUC's published trigger, the earlier proposal date does not remove the Version 4 requirement. This example concerns document selection, not eligibility for a rate, incentive or particular PPA.
SDG&E's interconnection center explains that solar and battery applications are submitted through its DIIS portal and provides process guides. Ask your installer for the application reference and next milestone. Keeping a guide in your files is not evidence that the utility has approved the project.
Use the guide to prepare useful PPA questions
A suitable PPA can help eligible homeowners access solar without purchasing the solar equipment outright. The current CPUC consumer guide is a starting point for reviewing the financial decision; the actual proposal must supply your terms.
Ask for the ongoing electricity payment rate, any escalator, contract length, equipment ownership, battery fees, maintenance and replacement coverage, home-sale transfer provisions and remaining utility charges. Confirm what a qualifying no-upfront offer includes for your property. It does not mean free electricity or guaranteed savings.
Keep the guide alongside the project's cost disclosures. Our SDG&E supporting-information guide explains another document to review when assessing the proposal's assumptions.
Review backup performance separately
The paperwork should support a clear equipment discussion. Ask the installer to list the backed-up circuits, available output, usable stored energy and intended reserve settings.
As explained in general battery guidance, household demand and available energy limit backup duration. Ordinary grid-tied solar alone generally cannot supply outage power. Compatible backup equipment is needed; solar recharging also depends on sunlight and system conditions. Completing a guide does not establish whole-home coverage or a guaranteed runtime.