SDG&E Solar PPAs: Clarify Site-Review Conditions

Ask how unexpected site findings affect an SDG&E-area solar and battery PPA, including revised equipment, payments, contract conditions and approvals.

For an SDG&E-served homeowner considering a solar-plus-battery PPA, ask what happens if the site review changes the project’s feasibility. A qualifying no-upfront offer can make equipment accessible while preserving cash, and clear site-review conditions help connect that offer to the home that will actually receive it.

Ask which findings could change the agreement

The CPUC solar consumer guide recommends asking the provider which circumstances would allow release from the contract. It gives unexpected roof shading discovered during a site visit as an example that could lead to cancellation. That is a possibility to clarify, not an automatic right triggered by any amount of shade.

Before signing, ask the provider to identify the relevant language in your actual agreement. Find out who evaluates a site finding, how the outcome is communicated and whether the response could involve a revised design, changed terms or ending the project. Do not assume every provider uses the same conditions.

Keep a short decision record

Our suggested homeowner record has four entries:

  • Original assumption: what the proposal expected about the property.
  • Confirmed finding: what the site review actually identified.
  • Proposed response: what changes, if anything, in the equipment, scope or agreement.
  • Written outcome: which version of the proposal now applies and what remains unresolved.

For a hypothetical example, suppose a preliminary proposal assumes one roof area is usable, but the site review leads the designer to propose a different layout. Ask for the updated production estimate and payment comparison together. The example does not establish that a change is required, that prices must rise or that either party can cancel a particular contract.

Keep the earlier and revised documents dated. If the provider says the original offer remains available, ask which assumptions have been confirmed. If something changes, ask how the agreement handles acceptance and any associated charges. This is a coordination checklist, not a substitute for the contract’s terms.

Track SDG&E review separately

A provider’s site assessment and the utility’s interconnection review are separate milestones. SDG&E’s installation center directs new solar and battery projects through its DIIS application process. Its initial technical review precedes the email authorizing installation to begin within that process.

Ask the installer whether a revised design requires an application update and what approvals remain. A site visit alone is not utility permission to operate. Our SDG&E installation-date guide addresses the separate scheduling discussion.

Recheck the payment and backup scope together

The CPUC guide explains that a PPA provider owns the solar system and charges for generated electricity. Review ongoing rates, escalators, term, battery fees, maintenance, replacement and transfer provisions, plus remaining utility charges. Confirm qualification for the actual no-upfront offer; it does not mean free electricity or guaranteed savings.

If the design changes, keep your essential-load list attached to the discussion. Ask whether the intended circuits and backup equipment remain included. General battery guidance explains that available charge and connected demand constrain duration. Ordinary grid-tied solar alone generally does not supply outage power; compatible backup equipment and sufficient output are required, and solar recharging depends on suitable sunlight.

Sources checked November 23, 2026. Bring the proposal, site-review questions and backup priorities to a West Coast Alternatives consultation to discuss suitable options with a clear path from assessment to installation.